Agenda item

Garden waste recycling trial on the Barbican and Golden Lane estates

Report of the Director of Built Environment.

Minutes:

The Committee received the report of the Director of Built Environment on the Garden waste recycling trial on the Barbican and Golden Lane estates. The Committee was informed that this was the second time such pilot scheme was carried out in the Barbican Estates.

 

Officers also took on the feedbacks from the residents and reassured the Committee that the Department will carry out a longer trial run from 16 March 16 October 2020 with two different location points within the Estate.

 

RESOLVED – That the Committee noted the report. 

 

Supporting documents: