Agenda item

Crown Place S278

Report of the Director of Built Environment

Minutes:

 

The Sub-Committee considered a report of the Director of Built Environment proposing works to accommodate the building on the public highway network. It was envisaged that the works would, amongst other things, include widening the footways, street lighting, drainage, the relocation of street furniture and an upgrade of the footway materials.

 

RESOLVED - To

 

1)            Authorise the City’s entry into a Section 8 Agreement with the London Borough of Hackney as detailed in section 25 of the report; and

 

2)            Authorise the City and the Developer to enter into a Section 278 Agreement as detailed in section 25 of the report.

 

Supporting documents: