Agenda item

LBC - 65-65A BASINGHALL STREET LONDON EC2V 5DZ

Report of the Chief Planning Officer and Development Director.

Minutes:

The Committee considered a report of the Chief Planning Officer and Development Director concerning65-65A Basinghall Street London EC2V 5DZ – specifically alteration of 65/65a Basinghall Street to allow for the removal of the existing walkway bridge over Basinghall Street and the installation of a new City Walkway bridge to be delivered as part of the redevelopment of 55 Basinghall/40 Basinghall Street (associated reference 21/00116/FULMAJ).

 

RESOLVED – That listed building consent be granted for the above proposal in accordance with the details set out in the attached schedule.

Supporting documents: