Report of the City Surveyor and the Managing Director of BHE
Minutes:
The Board received a report of the City Surveyor and the Managing Director of BHE regarding the refurbishment of the High Voltage (HV) and Low Voltage (LV) electrical infrastructure at Tower Bridge and increasing its power resilience (i.e., the secondary source of power in the event of a power failure).
RESOLVED – That the report be noted.
Supporting documents: