Members received a report of the Executive Director Community and Children’s Services providing a summary of housing performance for the period April 2026 to July 2026, drawing on the Housing Performance Dashboard and related operational performance updates.

 

Specific performance scores were discussed:

  • A Member queried the 60% target for the "Listens & Acts" Tenant Satisfaction Measures score. Officers acknowledged there was an issue of trust and confidence, and while they aimed for 100%, 60% was a realistic target.
  • A Member asked about the Decent Homes target and when the stock condition would be addressed. Officers advised that the target was 100%, however this would not be achieved until completion of the Major Works Programme, which the Regulator of Social Housing was aware of. The Stock Condition Survey analysis was almost complete and could affect the current performance figure. A Member suggested separate targets for before and after completion of the Major Works Programme.
  • A Member questioned the reported 91% electrical safety compliance figure, noting their experience of a contractor failing to attend an electrical safety check. Officers apologised and confirmed that the figure was accurate. An electrical safety check was only recorded as complete once the required certificate had been verified as correct and recorded on the system.
  • A Member expressed concern that repairs calls performance had fallen to 61%. Officers advised there had been a significant increase in calls in July (consistent with previous years) which resulted in longer pick-up and call times. Officers acknowledged that performance was not where it should be but advised that the Barbican would be separated from the repairs service desk in September, which was expected to improve performance. Other measures being implemented to improve performance included increased call monitoring, including live call listening and individual officer monitoring, and improved visibility of incoming calls, including identifying emergency calls. A Member raised concerns about lack of support to leaseholders, for example in the case of leaks where the issue may be coming from a neighbouring tenanted property.  Officers confirmed that leaseholders could contact the repairs desk, and ongoing training and coaching was being provided to improve triaging which would help address this issue.

 

The Chairman noted a disconnect between reported performance and Members’ experiences and stated the need to acknowledge that while there were improvements in some areas, difficult issues were still to be addressed.

 

Members sought clarity on compliance with Awaab’s Law, including whether emergency repairs and damp and mould cases were being measured against its requirements, the 10-day target for damp and mould inspections, and the distinction between emergency and significant hazards. Officers advised in response:

  • Current reporting did not enable differentiation between the statutory timescales, but work was underway to enable this. 
  • The 10-day inspection timeframe applied to significant damp and mould hazards, while emergency hazards required a 24-hour response.
  • The definition of emergency and significant hazards was determined by the Housing Health and Safety Rating System. Emergency hazards presented an immediate and significant risk, while significant hazards were urgent but not necessarily immediate. Effective triaging of calls was important for correctly prioritising hazards, and work was underway to improve this process.
  • Further Awaab’s Law requirements were expected, and officers would provide a separate report on compliance.

 

Members raised concerns about the arrears amount. Officers responded that additional work was underway to improve income collection and intervene earlier to prevent arrears escalating.

 

A Member asked when improvements in outcomes, including fire safety, electrical compliance and Decent Homes standards, could be expected. Officers noted improvements had been made despite the pressures caused by Chigwell stopping work. Additional contractor capacity had been brought in to address outstanding repairs while longer-term procurement was being considered. Electrical safety compliance had continued to improve, while work on communal inspections and certificates remained in progress. There had also been improvements in the lift service following changes to the contractor.

 

A Member asked what had changed from the tenants’ perspective since the inspection report. Officers undertook to put this question to the Resident Voice Group to gather feedback on their experience.

 

A Member highlighted that residents’ experience of repairs would impact their perception of the Major Works Programme and sought clear timescales for tangible improvements and disaggregated data. Officers acknowledged that the repairs service affected tenants’ perceptions of the wider service and while there had been some progress in improving the repairs service, further work was needed.

 

A Member requested further benchmarks to contextualise performance. Officers advised that the Tenant Satisfaction Measures provided benchmarking, including comparison with other London authorities. The current performance report lacked trend analysis as it was only in its second year, however this would become available as reporting matured.

 

A Member commented that the reference to the Housing Service continuing to “maintain a strong performance” should be reworded considering the C3 rating.

 

RESOLVED – That, the report be noted.