Report of the Director of Open Spaces
Minutes:
The Committee noted that the Hampstead Heath Ponds Project remained the highest risk and highest profile departmental project. Planning permission was granted by the London Borough of Camden Development Control Committee on the 15th January 2015. This project had slipped as a result of a delay in appointing an
independent Panel Engineer Reviewer, which the London Borough of
Camden determined was required. In December, the outcome of the Judicial
Review decision was received, the Heath and Hampstead Society’s (the
Society) claim was dismissed by the Honourable Justice Lang and the Society
decided not to appeal.
Progress has also been made on the Highams Park Dam Project. Lake
desilting was completed in December 2014 with removal of 5000m3 of silt.
The reinforced concrete works for the floodwall are complete with the brick
cladding almost complete. The drawdown structure is currently under
construction with the reinforced concrete works for the inlet and outlet
structure installed. Project completion is on target for March 2015.
RECEIVED.